Ardscoil Phádraig (Granard, Co. Longford)

Project Overview

A single high-efficiency heat pump replaced ageing infrastructure, delivering clean, low-maintenance heating through the school’s existing LTHW network—future-ready for expansion. 

Scope of Works

  • 1 × MasterThermBA60iP inverter heat pump (space heating)

System Description

  • Up to~30 kW output with continuous inverter modulation for stable temperatures and strong part-load performance.
  • Integrated PLC handles weather compensation, schedules, and diagnostics withremote monitoring as standard.

Project Results & Benefits

  • Reliable comfortacross the timetable.
  • Lower running cost legacy oil/gas plant.
  • Simple operationwithout external BMS.
  • Renewable heatthat supports sustainability goals.
Ard Scoil Padraig Granard